Frequently asked questions
The questions buyers ask before the first order.
MOQ, samples, payment, lead times, inspection and freight — answered without the hedging. If your question is not here, send it and we will answer it directly.
Working with us
How the relationship is structured, and what we are accountable for.
We act as your purchasing department in China. In practice that means finding and verifying factories, comparing quotations, coordinating samples, placing and monitoring the order, inspecting before shipment, and arranging freight and documents.
The value is not the supplier list — it is the judgement applied at each step: which factory can actually hold your tolerance, which certificate will survive customs, and which delay is worth escalating today rather than next week.
A platform sells visibility; a trading company sells a marked-up product. We sell verification and management, and we are paid by you rather than by the factory.
- A trading company hides the factory. We disclose it and show you the audit.
- A platform cannot tell you that a supplier's CE report covers a different model. We check before you pay.
- We have no incentive to push one factory over another — our fee is the same either way.
Three models, agreed in writing before any work starts:
- Commission on FOB value — typical for repeat production orders.
- Fixed project fee — for a defined scope such as a factory audit, an inspection programme or a sourcing study.
- Monthly retainer — for buyers running continuous product development.
Factory pricing is presented separately from our fee, so you can always see what the product costs and what the service costs.
Yes — before you share drawings, specifications or supplier names. We can sign your template or provide ours. Supplier identities, pricing and specifications are never shared with another client, and we do not work for two competing buyers on the same product line.
Yes, and we would rather start that way. Most clients begin with one SKU, a sample run or a single container. It gives both sides a low-risk way to test how the other works before committing to a season's volume.
MOQ & samples
What the minimum really is, and how to test before you commit.
It depends on the product and whether tooling is involved:
- Electronics from an existing mould: 500–1,000 units.
- Custom tooling or housing: 1,000–3,000 units for the first run.
- LiFePO4 packs: 50–100 units.
- Solar connectors and cable: sold by the pair or metre, minimums start at 5,000 pairs or 10,000 m.
We negotiate MOQ down by combining SKUs into a single production run. If a supplier quotes a number that does not fit your plan, we say so rather than absorb it.
Yes. Stock samples ship in 3–7 days; customised samples with your logo or packaging take 7–15 days. Samples are usually charged at unit price plus courier, and most factories credit that cost against your first bulk order.
We inspect the sample against your checklist before it leaves China, and send photos, measurements and test notes so you know what you are approving — not just that a parcel is on its way.
Yes — logo printing, custom housings, retail boxes, manuals and market-specific labelling. We manage dielines, colour proofs and barcode verification, and confirm in writing who owns the tooling and where it is stored.
Payment
Who gets paid, when, and what protects the money.
The standard is 30% deposit by T/T, 70% before shipment, with the balance released only after inspection approval. Above roughly 50,000 USD, letter of credit at sight is often accepted. Some suppliers work with escrow platforms such as Alibaba Trade Assurance.
Payment schedules are written into the purchase order we review before you sign, so there is no ambiguity about what triggers the balance.
The factory. We never ask you to transfer order value to our account. Deposits go directly to the supplier against a PO we have checked, and our service fee is invoiced separately.
If you prefer an extra layer of protection, we can coordinate payment through an escrow platform in your name.
Lead times
What is realistic, and what usually goes wrong.
For repeat orders without new tooling:
- Electronics and solar accessories: 20–30 days.
- Battery packs and power stations: 30–40 days.
- Home ESS modules: around 45 days.
Add 7–15 days for new tooling, custom packaging or first-time certification. Sea freight adds 25–40 days depending on destination; air is 5–8 days door to door.
In our experience, rarely the assembly line. The usual causes are:
- Sub-supplier materials — cells, ICs, aluminium profiles arriving late.
- Artwork and packaging approval sitting in someone's inbox.
- Certification testing taking longer than quoted, especially for batteries.
- Chinese New Year — a three-week window that becomes six weeks if the order is placed late.
We build buffer into the schedule, flag these four risks at the quoting stage, and report any slippage the day we learn about it.
Quality & inspection
The standard applied, and what happens when goods fail.
Pre-shipment inspection follows ISO 2859-1 with AQL 2.5 for major defects and AQL 4.0 for minor defects, plus zero tolerance for critical defects — safety issues, non-functional units, wrong certification labels.
Beyond the visual checks we run category tests: battery capacity and cycle checks, charger hipot and leakage, connector pull force, carton drop and compression, and barcode verification.
Production is not released and the balance is not paid. The factory receives a written defect report with photos and measurements, and we agree a rework plan with a revised completion date and a re-inspection.
If the defect is systemic, we escalate to a replacement run or a documented price adjustment. Fixing a defect in China costs a fraction of fixing it in Rotterdam.
Yes. We coordinate sampling and follow-up with SGS, TÜV, Intertek or BV for CE, FCC, RoHS, UN38.3, IEC 62619 and similar scopes. We verify that the final report names your exact model, cell and factory — a mismatch here is the most common reason a container gets held.
Send photos and the inspection report reference. We raise the claim with the factory, negotiate replacement or credit, and hold the next order's deposit until it is settled. Claims are far easier to win when the pre-shipment report and loading photos already exist — which is one reason we document every stage.
Shipping & logistics
Incoterms, modes, batteries and delivery to your door.
FOB, CIF, CFR and DDP. We quote them side by side so you can compare the landed cost rather than just the product price. DDP is the simplest option if you would rather not deal with a forwarder or import clearance at all.
- Sea LCL — best per-unit cost for 2–15 CBM; slower and consolidated with other cargo.
- Sea FCL — best above ~15 CBM or when you need the container sealed at the factory.
- Air — for urgent restocks and high-value, low-weight goods; 5–8 days door to door.
- Rail — a middle option to Europe, typically 18–25 days, cheaper than air and faster than sea.
Yes — this is one of the most common ways we save clients money. Goods from multiple factories are delivered to our Yantian consolidation warehouse, checked against the packing lists, re-palletised and shipped under one set of export documents.
Yes. Lithium cells and packs move as Class 9 dangerous goods under UN38.3, with an MSDS, test summary and — where required — a dangerous goods declaration. Not every forwarder accepts them, and not every factory's paperwork is valid, so we verify the report against the exact cell and model before booking.
Yes. We can deliver DDP to an FBA fulfilment centre, a 3PL warehouse or your own dock, with carton labelling and pallet configuration prepared to the receiving facility's requirements. Appointment booking and delivery window coordination are handled for you.
Question not answered here?
Send it directly — you will get a specific answer from a sourcing manager, not a template.
Ready when you are
Send your spec. We will send back a plan.
A photo, a drawing or a competitor link is enough to start. You get indicative pricing, a realistic timeline and the risks we would flag — before you commit to anything.